Transportation
Transportation Transportation Transportation Transportation Transportation Transportation Transportation Transportation Transportation Transportation Transportation Transportation Transportation A PV module is an
, ,
Services: Hazardous Materials Assessments Asbestos Survey Report Hazardous Building Material Survey Report ASC/Auxano has completed hazardous materials assessments for approximately 580,000 s.f. of building, the...
Read More
, , ,
Services: Field Sampling Plan Quality Assurance Project Plan Hazardous Materials Assessment HAER Documentation ASC/Auxano performed hazardous materials Assessments for the Piqua Nuclear Power Plant that...
Read More
, ,
Services: Section 106 Scoping Request Level 1 Ecological Survey Regulated Materials Review (RMR) Asbestos Inspection and OEPA Demolition Form RMR Assessment Categorical Exclusion Document ASC...
Read More
, ,
Services: Phase I Archaeological Survey Coordinate Concurrence with Mitigation Strategy Develop Data Recover Plan Phase III Archaeological Excavation ASC Group completed a Phase III Data...
Read More
, ,
Services: Section 106 Review – Project Summary Form Phase I Archaeological Survey ASC Group completed initial and follow up investigations for the Stickney Creek Stream...
Read More
, , , ,
Services: Cultural Resources Records Check Phase Ia Archaeological Survey Historic Properties Report Section 4(f) Evaluation Section 6(f) Evaluation Environmental Assessment Red Flag Summary of Findings...
Read More
, , , ,
Services: Cultural Resources Project Information Package Level 2 Ecological Survey Environmental Site Assessment Screening Asbestos Inspection Section 404 Permit Application Memorandum of Agreement Documentation for...
Read More
, ,
Services: Phase I History Architecture Survey Phase I Archaeological Survey ASC Group conducted a Phase I cultural resources survey for Avondale Bridge replacement on County...
Read More
, ,
Services: Phase I Archaeological Survey Section 4(f) PA Historic Resource Survey Forms The project consists of the widening of the US 22 and PA 36...
Read More
, , ,
Services: NEPA Clearance Wetlands T&E Survey PHRS Forms Ag Resources Phase I Archaeological Survey The proposed project is the widening of the intersection to add...
Read More
, ,
Services: Historic Properties Survey Section 106 Documentation Phase Ia Archaeological Survey Phase Ib Archaeological Survey The project included improvement of the I-65/I-70 corridor through Indianapolis,...
Read More
, ,
Services: Historic Properties Survey Phase Ia Archaeological Survey ASC completed both aboveground and archaeological surveys for the Blue Line project, which is a bus rapid...
Read More
, ,
Services: Permitting (PADEP/USACE Joint Permit) Environmental Studies including:    Wetland Delineations    Wetland Functional Assessments    Mitigation Design T&E Species Agency Coordination and Mitigation This...
Read More
, ,
Services: Environmental Design and Evaluations Health and Safety Plan Site Investigation/Assessment of Existing Conditions Hazardous Materials Surveys Technical Studies/Analysis Six structures within the US Army...
Read More
, , ,
Services: Phase Ia Archaeological Records Check and Survey Historical/Architectural Records Check and Survey Waters of the U.S. Determination/Wetland Delineation/Ecological Survey Categorical Exclusion Level 1 Waterway...
Read More
, ,
Services: Historic Properties Field Assistance and Report Preparation Assessment of Effects Report Phase Ia Archaeological Survey Phase III Data Recovery Plan Phase III Data Recovery...
Read More
, ,
Services: Historic Properties Survey Section 106 Documentation Archaeological Records Check Phase II Archaeological Investigation ASC Group completed Phase I archaeological surveys, an architectural resources survey, and a...
Read More
, ,
Services: Ecological Survey Threatened and Endangered Species Survey Waterway Permit Package Stream Mitigation Opportunities Inventory Report (SMOIR) History/Architecture Reevaluation Report ASC was contracted by HDR...
Read More
, ,
Services: Cultural Resources Literature Review Phase I Archaeological Survey Phase I Aboveground Survey This public-private partnership (P3) Rapid Bridge Replacement Project was awarded by the...
Read More
, ,
Services: Threatened & Endangered Species Survey ASC Group conducted a Virginia spiraea survey in September 2017. WVDOH staff provided ASC with transportation to the sites....
Read More
, , ,
Services: NEPA Clearance Geomorphological Survey Phase I Archaeological Survey The project consists of the proposed construction of a levee system to protect Wilmore Borough from...
Read More
, , ,
Services: NEPA Clearance Permitting Environmental Studies Phase I Archaeological Survey PA Historic Resource Survey Forms The project consists of the proposed replacement of the Crum...
Read More
, , ,
Services: Archaeological Survey Historic Properties Survey Section 106 Findings of Effects Waters of the U.S./Wetland Delineation Phase I Initial Site Assessment Noise and Air Analysis...
Read More

DBE / WBE / SBE / WOSB

Columbus, OH

(614) 268-2514

Tina Hartman Davis

800 Freeway Drive North,
Suite 101
Columbus, OH
43229

Cleveland, OH
(440) 845-7590
David Klinge

7123 Pearl Road,
Suite 107
Middleburg Heights, OH
44130

Cincinnati, OH
(937) 271-1226
Nichole Lashley

4555 Lake Forest Drive,
Suite 650,
Cincinnati, OH
45242

Florence, KY
(937) 271-1226
Nichole Lashley

7310 Turfway Road,
Suite 550,
Florence, KY
41042

Indianapolis, IN
(317) 915-9300
Harry Nikides

9376 Castlegate Drive,

Indianapolis, IN
46256

Harrisburg, PA
(717) 564-5705
Hylton Hobday

801 East Park Drive,
Suite 102,
Harrisburg, PA
17111

en_USEnglish